ATSE frame

ATSE 2000A–3200A

High-capacity frame for utility incomers, large data halls and process plants.

3200A large capacity automatic transfer switching equipment cabinet in a switchgear room

Key characteristics

  • Designed for utility-to-generator main incomer duty
  • Mechanical interlock with position feedback
  • Supplied as a complete changeover assembly
Datasheet

The ATSE 2000A–3200A datasheet and IEC 60947-6-1 type-test evidence are issued on request so the current revision reaches your project file.

Request datasheet
Specification

ATSE 2000A–3200A parameter table

Values shown are typical for this frame. Request the datasheet for project-specific figures and tolerances.

ATSE 2000A–3200A — parameter table
ATSE 2000A–3200A — parameter table
Current RatingPolesTransfer TimeControl VoltageStandardMechanical Life
2000A – 3200A3P / 4P1.5 s – 15 s, adjustableAC 220V / 230VIEC 60947-6-14,000 operations (typical)

Typical applications

  • Utility incomer changeover at 2000A and above
  • Large data hall generator switching
  • Heavy process plant main distribution
Reference notes

Statements confirmed for this frame

  • 01

    The 2000A–3200A ATSE is supplied as a complete changeover assembly tested to IEC 60947-6-1 in PC class.

  • 02

    It is intended for main incomer duty where the changeover device is coordinated with upstream utility protection.

  • 03

    Position feedback and interlock status are provided for integration with plant control systems.

FAQ

Questions on this frame

Why is the 3200A frame offered in PC class only?

At this rating the changeover device carries and closes on fault current, while short-circuit interruption is handled by the upstream breaker in the coordination study.

Can it be delivered as a complete assembly rather than a bare device?

Yes. This frame is normally supplied as a complete changeover assembly with busbars, controller and interlocks mounted and factory tested.

What information is needed to size a 2000A+ changeover?

Continuous current, fault level, earthing system, generator start profile and the required maximum transfer time are the main inputs.

Request a quote for ATSE 2000A–3200A

Send the board design current, pole configuration and required transfer time. We will confirm the frame and control voltage.